Toluca Valley Aqueduct Socioeconomic Assessment
“Cost-benefit analysis on construction of an aqueduct located in Toluca Valley ”, that captures water from the Nevado of Toluca, Dam deposit in Ignacio Ramirez and there Cutzamala injects the aqueduct system to increase its volume driven.. This additional amount would be used to benefit five municipalities in eastern state of Mexico and capture runoff also serve to prevent flooding in the city of TolucaMain objectives
Solve the shortage of drinking water to the eastern part of the Metropolitan Area of Mexico.
Lost 3 runoff basins that discharge into the metropolitan area of Toluca, to prevent flooding to the area.
Benefited from the project area
The project is developed around the Toluca Valley, however the target population, is located in the municipalities of the State of Mexico with the Federal District, the east, with Chalco, Ixtapaluca, La Paz, Nezahualcoyotl and Valle de Chalco Solidaridad .
Project
The project consists of water conveyance of the Chiquito and San Pedro rivers Dam Ignacio Ramirez through the Almoloya river and catchment runoff in the basin of the dam itself, purification, pumping and driving through an aqueduct length variable, which connects the conduit of the Cutzamala system to supply drinking water to five municipalities in the East of the State of Mexico.
The project, besides being a complementary source of supply of drinking water for the Cutzamala System, mitigate the effects of flooding caused by the channels passing north of the metropolitan area of the city of Toluca in the rainy season.
(1219)
Related Representative projects
-
Technical, Legal, Cost Consultants - Financial Benefit and the Federal Nuevo Necaxa - Tihu...
FOA Consulting conducted demand studies, and assessment for the project implementation, cost - benefit analysis and fina...
-
Integral advice for the development of the "City of Knowledge of Health" in DF
FOA Consulting proposed the concept of development for the Health Knowledge City, performed the analysis of business opp...
-
Cost Benefit Analysis of the Durango – Mazatlan Highway
FOA Consulting conducted the economic assessment of the Durango Mazatlan highway, used to register the project to the In...
-
Project management to attend the demand of Airport Services in the Country Center
FOA Consulting services as part of the Management of the New Airport of Mexico City Project, consist mainly of risk mana...
-
Market Research, Analysis Cost - Benefit Project and Financial Feasibility of New Airport...
FOA Consulting conducted market analysis, cost - benefit analysis and financial evaluation of the project to feasibility...
-
Development Master Plan of the International Airport of Puebla
FOA Consulting joined the Master Plan development planning of infrastructure, facilities, equipment and services in the...
-
Studies for the Establishment of the Logistics Activity Zone of Progreso
The project included the development of a conceptual area of logistics in the vicinity of Merida and Progreso activities...
-
Studies for the establishment of school´s drinking fountains.
FOA Consulting conducted the study demand, Eligibility Index Public Private Comparator and by analyzing the Value for Mo...
-
Market and Cost Benefit Study for the completion of the railroad Ing. Ayala-Dos Bocas.
Market analysis for loads capable of mobilizing product quantification of investment, financial assessment and cost-bene...
-
Piedras Negras- Eagle Pass Rail Bypass New Bridge and Border
The project included the analysis of demand for the railway line, analysis of urban development in the city of Piedras N...
-
Integral Study for Modernization of the Port of Puerto Vallarta
The project involved the development of a proposal for the development of facilities for the care of cruises and nautica...
-
Cost-benefit analysis New Port of Mazatlan
Cost-Benefit Analysis with the Guidelines of the Investment Unit of the Ministry of Finance was developed for New Port o...
-
Structuring the Integral Port Administration of the Ports of Campeche.
General management functions with respect to financial policies, business units to develop and short-term commitments.