Federal Program to Support Mass Transit (PROTRAM)

FOA Consulting for their extensive experience in mobility projects participated in the design of the Federal Program for Development Support Urban Mass Transit (PROTRAM).

Background

The Federal Government did not have any support mechanism for the development of mass transit projects, for which he agreed with the World Bank technical support.

FOA Consulting specialists were integrated into the team of the World Bank to design a federal program to support the development of urban mass transit solutions, as a tool for the Federal Government.

Design a federal program to support the development of high capacity public transport project

A preliminary diagnosis of the situation of mass transit in Mexico is made, various international experiences, investment opportunities in Mexico, and frameworks for private sector involvement were analyzed in order to design a federal program that would support large projects magnitude.

A national policy for urban mobility

Was developed guidelines for a national policy on urban transport, in which the general criteria for project development with federal support were proposed, as well as guidelines for evaluating projects of high capacity public transportation and gave recommendations of the institutional organization for the Federal Government to   developed and implemented them.

(0741,1218)

Related Representative projects

  • Image
    Integral Sustainable Urban Mobility Plan of the Metropolitan Area of San Luis Potosi.........

    FOA Consulting conducted the Integral Sustainable Urban Mobility Plan for the Metropolitan Area of San Luis Potosi and t...

    Read more

  • Image
    Demand Studies and Restructuring of Routes of Mexibus II

    FOA Consulting conducted studies of demand and restructuring of the transport routes Traditional feed routes of Mexibus...

    Read more

  • Image
    Integration Program of Road and Metropolitan Area Transport

    The study's main objective is to establish the rules and procedures for planning and coordinating mechanisms which permi...

    Read more

  • Image
    Management Project of Suburban Railway System

    FOA Consulting provided the services of Project Management required for compliance with appointments, tasks, and other i...

    Read more

  • Image
    Development of Risk Management Platform

    We adopted this type of sistemic tool based on the International Standard ISO 31000 for Risk Management and its designat...

    Read more

Certifications

CNEC
CONCAMIN

Afiliations

CNEC
AME
FEAOE
FIDIC