Mobility and Sustainable Transport

imagen

Development of Risk Management Platform

We adopted this type of sistemic tool based on the International Standard ISO 31000 for Risk Management and its designated PGPI-Risk Technology Platform

Risk management system for infrastructure projects PGPi-Risk

The monitoring of risk management is performed through our Management Platform of Infrastructure Projects for Risk (PGPI-Risk).

The objective of PGPi-Risk is to implement in automated system of risk management, incorporating systemic approach to internal components of the infrastructure project in question as well as the components in your environment that could generate risk events , which is designed along the lines of international standard practical improvements to concerning risks "ISO 31000".

The PGPi-Risk is a web tool that allows the permanent monitoring of progress of risk management, optimizing response times in decision-making to achieve the planned objectives.

With the platform we generated the automation of the risk management processes resulting in a significant time optimization in the generation of information, communication, decision making, implementation of preventive or corrective actions as the case.

Related Representative projects

  • Image
    Integral Sustainable Urban Mobility Plan of the Metropolitan Area of San Luis Potosi.........

    FOA Consulting conducted the Integral Sustainable Urban Mobility Plan for the Metropolitan Area of San Luis Potosi and t...

    Read more

  • Image
    Demand Studies and Restructuring of Routes of Mexibus II

    FOA Consulting conducted studies of demand and restructuring of the transport routes Traditional feed routes of Mexibus...

    Read more

  • Image
    Federal Program to Support Mass Transit (PROTRAM)

    FOA Consulting for their extensive experience in mobility projects participated in the design of the Federal Program for...

    Read more

  • Image
    Integration Program of Road and Metropolitan Area Transport

    The study's main objective is to establish the rules and procedures for planning and coordinating mechanisms which permi...

    Read more

  • Image
    Management Project of Suburban Railway System

    FOA Consulting provided the services of Project Management required for compliance with appointments, tasks, and other i...

    Read more

Certifications

CNEC
CONCAMIN

Afiliations

CNEC
AME
FEAOE
FIDIC