Rates and charging systems
The maturation of projects can bring new challenges, such as the need to optimize the collection system and rates.
FOA has studied where their recommendations have led to increases of up to 30% of revenue in one year, to implement improvements to the collection system and rates.
Related Representative projects
-
Rate scheme for determining APIs productivity
The proposed tariff model is a tool that enables and facilitates the API's developing their tariff proposal for the use...
-
Assignment Study and Forecast Traffic: Siglo XXI Highway
FOA Consulting determined assigned, induced and generated traffic for the XXI Century Highway as well as its growth fore...
-
Demand Studies and Restructuring of Routes of Mexibus II
FOA Consulting conducted studies of demand and restructuring of the transport routes Traditional feed routes of Mexibus...
-
FARAC Highways Econometric Studies (several axes )
The study consisted of the approach of a strategy to determine the rates that maximize revenue and FARAC gauging the net...
-
Fee Scheme implementation in the Ports of Mexico
Charging information for the operation of tariff and personnel training model of each API´s in a personalized way in the...