Rates and charging systems

The maturation of projects can bring new challenges, such as the need to optimize the collection system and rates.

Image

FOA has studied where their recommendations have led to increases of up to 30% of revenue in one year, to implement improvements to the collection system and rates.

Related Representative projects

  • Image
    Rate scheme for determining APIs productivity

    The proposed tariff model is a tool that enables and facilitates the API's developing their tariff proposal for the use...

    Read more

  • Image
    Assignment Study and Forecast Traffic: Siglo XXI Highway

    FOA Consulting determined assigned, induced and generated traffic for the XXI Century Highway as well as its growth fore...

    Read more

  • Image
    Demand Studies and Restructuring of Routes of Mexibus II

    FOA Consulting conducted studies of demand and restructuring of the transport routes Traditional feed routes of Mexibus...

    Read more

  • Image
    FARAC Highways Econometric Studies (several axes )

    The study consisted of the approach of a strategy to determine the rates that maximize revenue and FARAC gauging the net...

    Read more

  • Image
    Fee Scheme implementation in the Ports of Mexico

    Charging information for the operation of tariff and personnel training model of each API´s in a personalized way in the...

    Read more

Certifications

CNEC
CONCAMIN

Afiliations

CNEC
AME
FEAOE
FIDIC